Mining Operations

Tonnes / day

18,420

+640

Active stopes

27

+2

LTIFR

0.18

-0.04

Equipment uptime

88%

+1.3%

Grade (g/t)

4.6

+0.2

Open hazards

5

-3

Daily tonnage

Planned vs hauled (t)

AI insights

Suggested next actions

  • Stope 14 East trending 6% below grade — re-survey ore body before next blast cycle.

  • Hauler HT-09 vibration signature suggests differential wear — schedule overhaul before 250h mark.

  • Methane sensor in Shaft 3 logged 0.8% spike during night shift — increase ventilation set-point to 110%.

Production cost

Budget vs actual (ZAR ‘000s)

Active programmes

Live programme progress

Shaft 3 deepening18 months
58% completeOn track
Tailings reclaim project9 months
32% completeWatch
Pit West cutback5 months
74% completeOn track
Solar PV hybrid plant24 months
12% completeJust started

Alerts

Last 24h

  • CH4 spike · Shaft 3 L24High
  • Hauler HT-09 — overheatingMed
  • Permit overdue · L26 drillingMed
  • Lamp room stock lowLow

Recent activity

Field updates

  • TN

    Themba N. signed off blast permit MN-3301

    9m ago

  • ML

    Megan L. uploaded geotech report L26

    32m ago

  • SD

    Sibusiso D. rotated haul fleet to Pit West

    1h ago

  • LM

    Lindiwe M. closed hazard report HZ-2018

    2h ago

Chat