Civil Engineering & Infrastructure

Packages live

9

+1

Plant in use

78%

+3%

Earned value

R 412M

+R 18M

Programme float

12 days

+2

Safety LTIFR

0.22

-0.05

Open NCRs

4

-2

Programme % complete

Planned vs actual

AI insights

Suggested next actions

  • Package P-04 asphalt laydown trending 6% behind — consider weekend shift to recover float before Q3 milestone.

  • TLB-12 fuel burn 18% above fleet median — flag for service and operator coaching.

  • Rain forecast on N3 corridor — pull forward earthworks at P-07 to Wednesday to protect SANRAL milestone.

Plant & materials cost

Budget vs actual (ZAR ‘000s)

Active work packages

Live programme progress

SANRAL N3 widening (P-04)9 months
64% completeOn track
Tshwane bulk water (P-07)14 months
41% completeWatch
Olifants bridge B-034 months
78% completeOn track
Pretoria East township22 months
18% completeJust started

Alerts

Last 24h

  • P-04 asphalt run behind floatHigh
  • TLB-12 service overdueMed
  • Concrete cube fail · CV-6606Med
  • Surveyor leave clash · week 21Low

Recent activity

Field updates

  • LK

    Lerato K. logged 320m³ asphalt laid

    12m ago

  • MS

    Mpho S. signed off SANRAL inspection CV-6608

    34m ago

  • AM

    Asanda M. uploaded bridge formwork photos

    1h ago

  • KF

    Karin F. closed HSE walk findings

    2h ago